SURVEY DIVISION LIST
OF MAJOR SURVEYING PROJECTS PERFORMED SINCE 1984 |
||||||||
|
Client's Name Contact/Phone No. |
General
Description Of
Work |
Location |
Value (SR) |
Average Manpower |
Prime or Subcontract Responsibility |
Start Date |
Completion Date |
|
|
Type |
No. |
|||||||
|
Saudi
Aramco Surveying
Services Division (SSD) DHAHRAN Tel. # 03-872 7811 |
General Surveying Services: - Provision of
survey staff as per request - Topographic Survey
& Photo Controls - As-Built,
Profiling, Volume and all aspects of field Engineering |
Saudi Aramco Operating Areas |
30 Million 4.9 Million 32.9 Million 18 Million Estimated 10 Million |
Field Crew Survey CAD
Draftsman Photogrammetrist System Analyst Supervising
Surveyor Hydrographic Cartographer |
4 7 4 3 1 3 |
Prime Subcontract Prime Prime Prime |
Sep/85 Jan.-91 Sep.-95 Oct.-03 Jan-09 |
Dec-1990 Dec-1992 Nov-2003 Jan-2009 Jan-2012 ON GOING |
|
Hod-hod
Establishment For / P.T.T Tel. # 01- 491 9516 |
Visibility Study of - Profile survey for
|
Between Jeddah and Makkah |
40,000 |
Field Crews (4 men) Survey CAD Draftsman |
2 1 |
Prime |
Oct-84 |
Nov-84 |
|
B.K.S.
Surveys Ltd. For / MOMRA Project # 107 Tel. # 01- 402 4462 |
Photogrammetric Ground Controls - Pre-marking of
photo control points - Establishing
horizontal and vertical - Controls positions
include G.P.S. Fixation. - Map compilation
and Name collection s |
Eastern Province |
7.2 Million |
Field Crews (3 men) Survey Controller Survey CAD Draftsman Project Manager Quality Controller |
5 4 2 1 2 |
Prime |
Apr-84 |
Dec-86 |
|
Pegel
Arabia For / Saudi Aramco Tel. # 03-864 140 |
As-Built Survey: - As-Built survey of
ARAMCO security Fence |
Safaniyah Juaymah and Abqaiq |
60,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Prime |
Oct-84 |
Feb-85 |
|
Saudi
Consulting Services For / M.O.C Tel. # 01- 464 7540 |
Road Survey: - 40 Km. long of
proposed road. - Profile survey and
Establishing Controls |
Ras Abu Qumayyis Saudi - Border |
85,000 |
Field Crews (3 men) Survey Controller Survey CAD Draftsman Supervising Surveyor |
2 1 1 1 |
Prime |
Jan-85 |
Feb-85 |
|
SCECO-East Tel. # 858 6463 |
General Surveying Services: - Establishing
Controls - Topographic, Plan
and Profile Surveys - Drafting works (in
house)+ Other survey services as required by client |
SCECO East Operating Areas |
1.3 Million |
Field Crew (4 men) Survey CAD Draftsman |
1 2 |
Prime |
May-85 |
Apr-88 |
|
Saudi
Arabian Vulcan Ltd. Tel. # 03-341 7377 |
Quantity Survey: - Stockpile survey
and volume Calculations. |
Jubail Nariyah Safaniyah Khafji |
170,000 |
Field Crew (4 men) Survey CAD Draftsman Survey Controller |
1 1 1 |
Prime On-call basis |
Oct-85 |
Jun-90 |
|
Siemens Tel. # 03-857 5316 |
Topographic Survey & Mapping: - Establish
horizontal and vertical controls - Tie-in site
coordinates to N.G.N coordinates system. |
Dammam |
50,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Prime |
Nov-85 |
Nov-85 |
|
Bin
Sahal abolishment For / Ministry
of housing Tel. # 03-894 2892 |
Utilities Survey: - Setting out and
Quality Control of sewage and water installations. |
Housing Project Al Hasa |
200,000 |
Field Crew (3 men) Project Engineer |
2 1 |
Prime |
Dec-85 |
May-86 |
|
McClelland
Suhaimi Ltd. For / Brown &
Root Tel. # 03-857 2163 |
Saudi Iraqi Pipeline Project - Topographic survey
and mapping - Fixing control
points - Establishing site Boundary monuments |
Yanbu Marine Terminal |
200,000 |
Field Crews (3 men) Project Manager Survey Controller Survey CAD Draftsman |
2 1 2 |
Subcontractor |
Jan-86 |
Mar-86 |
|
Harza
Engg. Tel. # 03-8271252 |
Qatif Irrigation Project - Profiles and Cross
Section surveys - Provision of
computer plots |
Qatif |
30,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Prime On-call basis |
Dec-85 |
Mar-86 |
|
Saudi
Consulting house For / Ministry of
Industry Tel. # 01- 448
8151 |
Industrial Estate Expansion - Topographic survey
and Mapping for 3 sites - Establishing
Reference Control Points |
Jeddah & Dammam |
100,000 |
Field Crews (4 men) Survey Controller Survey CAD Draftsman |
3 2 2 |
Prime |
Feb-86 |
Apr-86 |
|
O.C.C.
Weavers Tel. # 02-651 7741 |
Topographic Survey & Mapping: - Topographic survey
and mapping includes setting out boundary corners for three sites. |
Jeddah Dhahran Abha |
40,000 |
Field Crew Survey CAD Draftsman |
1 1 |
Prime |
Mar-87 |
Apr-87 |
|
McClelland
Suhaimi Ltd. Tel. # 03-857 5752 |
Marine Terminal Phase II - Route survey and
Fixing Boundary points includes Mapping. |
Yanbu |
70,000 |
Field Crews (3 men) Survey Controller Survey CAD Draftsman |
2 1 2 |
Prime |
Oct-87 |
Dec-87 |
|
Gulf
Consult For / SCECO Tel. # 03-894 4468 |
Power Line Surveys: - Setting out 662
Points being centers of proposed Towers - 3 stages |
Dhahran Jeddah Khurais |
40,000 |
Field Crew (4 men) |
1 |
Prime |
Aug-87 |
Feb-88 |
|
Muhandis Nizar Kurdi For / R.D.A Tel. # 01- 477 0870 |
As-Built Survey: - As-built survey
for highly developed area near Qasr Al Hokum includes provision of as built
detail drawings |
|
50,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Sub Contractor For/Saud Consult |
May-87 |
Jul-87 |
|
T. R.
T. Saudi Arabia For / P.T.T. Tel. # 01- 482 9931 |
Profile Surveys of Telecom. Towers - Profile survey and
visibility study between proposed telecommunication sites. |
Hail Qasim & Asir |
215,000 |
Field Crews (2 men) |
4 |
Prime (2 stages) |
Mar-88 |
Nov-88 |
|
CRS
Sirrine + Metcalf & Eddy Jv. For / R.S.A.F. Tel. # 01-476 1900 |
Peace Shield Program - Topographic survey
and Mapping for 52 Remote Communication Sites. - Establishing
Reference Control Points |
Tabouk Al
Kharj Dhahran & Khamis
M. |
1.2 Million |
Field Crews (3 men) Survey Controller Survey CAD Draftsman Survey Supervisor Quality Controller |
4 2 2 1 1 |
Prime On-call basis |
Mar-88 |
Mar-89 |
|
B.K.S.
Surveys Ltd. For / MOMRA
Project # 110 Tel. # 01-402 4462 |
Photogrammetric Ground Control - All field works
related i.e. : - Traversing,
Leveling, Photo identification - Map compilation & Names collection |
Makkah Madinah Al
Jouf Quraiyat |
3.1 Million |
Field Crews (3 men) Supervising Surveyor Quality Controller Survey CAD Draftsman |
4 1 1 1 |
Prime |
Mar-88 |
Dec-91 |
|
MAPS
(U.A.E.) Tel. # 01-478 6671 |
Geodetic Survey: - Traversing &
Leveling along proposed Road center line |
Between Qaisumah |
30,000 |
Field Crew (4 men) |
1 |
Prime |
Mar-88 |
Apr-88 |
|
Idea
Perkins & Will For / Umm Al Qura
University Tel. # (02) 651
5392 |
Topographic Survey & Mapping: - Topographic survey
and mapping for the proposed site measuring 1600 hectares. - Establishing
controls, Traversing & Leveling - Tie-in site
controls to NGN system |
Makkah Umm Al Qura University |
350,000 |
Field Crew (3 men) Survey Controller Survey CAD Draftsman Supervising Surveyor |
3 2 2 1 |
Prime |
Jun-88 |
Dec-88 |
|
Al
Issa Consulting Engineers Tel. # 01-491 7880 |
Provision of survey crew services - Provision of
survey crew services to perform Topographic Survey |
|
40,000 |
Field Crew (4 men) |
1 |
Prime |
Jul-88 |
Aug-88 |
|
Eagleton
Saudi Tel. # 864 8847 |
Route survey - Power Line - Traversing,
Leveling and Establishing controls. Profile survey along proposed
transmission line (70 km) long - |
Sajir
to Khuff Central
Region |
70,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Prime |
Sep-88 |
Nov-88 |
|
Muhandis Nizar Kurdi Tel. # 01-476 7750 |
Provision of survey crew services - Traversing,
Leveling and Establishing controls points |
|
25,000 |
Field Crew (3 men) |
1 |
Prime |
Mar-89 |
Apr-89 |
|
Bin Qurayah Est. For / Saudi Aramco
Tel. # 03-572 6735 |
Provision of Survey Party Chief Services - Laying out
pipeline survey |
Abqaiq |
10,000 |
Party Chief |
1 |
Prime |
Jul-89 |
Aug-89 |
|
Siemens Project office For / M. O.I I Tel. # 01-482 6774 |
Topographic survey and Mapping: - Topographic survey
and mapping of proposed communication sites includes Tie-in
coordinates of each site to NGN coordinates system. |
Jeddah Haql Tabouk Salail & Dammam |
170,000 |
Field Crew (4 men) Survey Controller Survey CAD Draftsman |
1 1 1 |
Prime On-call basis |
Jul-89 |
Apr-92 |
|
Al
Issa Consulting and Engineers For / National
Guard Tel. # 01-491 7880 |
Boundary Surveys - Setting out &
Establishing boundary point every 1km. distance along the perimeter of a site
measuring 36 Km long |
Along Dammam Highway |
33,000 |
Field Crew (3 men) |
1 |
Prime |
Sep-89 |
Oct-89 |
|
Gulf Edible Oil Co. Ltd. Tel. # 833 1329 |
Site survey & Mapping - Topographic survey
and Mapping for proposed site at Dammam 2nd Industrial Area. |
Dammam |
15,000 |
Field Crew (3 men) Survey Controller |
1 1 |
Prime |
Dec-89 |
Dec-89 |
|
British
Aerospace For / R.S.A.F Tel. # 01-464 6600 |
Al-Yamamah Project - Topographic survey and mapping for 48
selected sites located at KKAB,
Khamis Mushait |
KKAB,
Khamis Mushait |
125,000 |
Field Crew (4 men) Survey CAD Draftsman Saudi Representative Survey CAD Draftsman |
1 2 1 1 |
Prime |
Dec-89 |
Feb-90 |
|
Saudi
Bahraini Cement Co. Tel. # 03-566 0600 |
Boundary Surveys & Establishing Grids - Setting out &
Establishing boundary points for two sites ( 4km x 2 km) and (2km x 1km) - Establishing Grid
Points @ 250m Intervals |
Uqair
and Umm
Huwaiyd |
45,000 |
Field Crews (3 men) Survey CAD Draftsman |
2 2 |
Prime |
Jan-90 |
Feb-90 |
|
Al-Issa
Consulting Engrs For / National Guard Tel. # 01-491 7880 |
Provision of survey crew services - Provision of
survey crew services to perform Topographic survey for an existing Military
Camp |
Al
Hasa |
90,000 |
Field Crew (4 men) |
1 |
Prime |
May-90 |
Jul-90 |
|
Arabian Consulting For / PETROKEMYA Tel. # 03-857 8110 |
Pipeline Survey & Mapping: - 68 Km of proposed
pipeline survey including plan and profile drawings and Road crossings
(ARAMCO standard) |
Juaymah to Jubail |
330,000 |
Field Crews (4 men) Project Manager Survey CAD Draftsman Survey Controller |
2 1 3 |
Prime |
Aug-90 |
Oct-90 |
|
Saudi
Wiemer & Trachte Tel. # 01- 241
2171 |
Topographic Survey & Mapping - Topographic survey
and Mapping for proposed communications tower locations. |
Tabouk Abha |
250,000 |
Field Crew (3 men) Survey CAD Draftsman |
1 1 |
Prime On-call basis |
Sep-90 |
Apr-92 |
|
CRS
Sirrine + Metcalf and Eddy Jv. For / R.S.A.F Tel. # 01-476 1900 |
Peace Shield Program - Topographic survey
and mapping for a proposed Military site in a remote area inaccessible by
vehicles" includes establishing Controls. |
Madinah
Area |
350,000 |
Field Crews (3 men) Survey CAD Draftsman Supervising Surveyor Survey Controller |
2 2 1 1 |
Prime |
Sep-90 |
Dec-90 |
|
MACE Saudi Arabia Ltd. For / US Army
Corps of Engineers Tel. # 03-894 8887 |
Topographic survey &
Setting out - Topographic survey
and mapping for six (6) military camps including Setting out of site corners and all utilities as per Eng.
Drawings. |
Eastern Province along
Saudi |
540,000 |
Field Crews (3 men) Survey CAD Draftsman Supervising Surveyor |
5 3 1 |
Prime |
Oct-90 |
Jan-91 |
|
Al
Haider Co. for Trading & contracting For/ SCECO East Tel. # 02-667 3700 |
Power line survey: - Plan and profile
survey for proposed Power Line measuring 27 km. long - |
Jubail
|
60,000 |
Field Crew (4 men) Survey CAD Draftsman |
1 2 |
Prime |
Feb-91 |
Mar-91 |
|
Olayan Descon Industrial Company Ltd. Tel. # 03-341 0672 |
Pipeline Survey: - As built plan and
profile survey for 2 km. of existing pipeline. |
Jubail Industrial
city |
25,000 |
Field Crew (3 men) Survey CAD Draftsman |
1 1 |
Prime |
Mar-91 |
Mar-91 |
|
Arabian Consulting Tel. # 03-857 8110 |
Expansion of SAMAREC Plant, Gizan - Topographic and
As-built Survey for a selected area at SAMAREC Plant in Gizan |
Gizan |
60,000 |
Field Crew (4 men) Survey CAD Draftsman |
1 1 |
Prime |
Apr-91 |
May-91 |
|
Al-Hammam
Company For / Saudi Aramco Tel. # 03-667 2715 |
Power line survey: - Marking power post
locations for 13.5 km. long of proposed Transmission line |
Manifa |
30,000 |
Field Crew (3 men) |
1 |
Prime |
May-91 |
Jun-91 |
|
For / MEPA Tel. # 03-857 3765 |
Quantity Survey: - Cross Sections and
volume calculations including setting out |
Khalij Mardomah Eastern Province |
96,000 |
Field Crew (4 men) Survey CAD Draftsman |
1 2 |
Prime Three (3) calls |
May-91 |
Nov-91 |
|
Rashid Geotechnical & Materials
Engineers Tel. # 01-477 3601 |
Provision of survey crew services - Topographic survey
and other survey Aspects as per client requirements. |
& Gizan |
240,000 |
Field Crew |
1 |
Prime Three (3) calls |
May-91 |
Feb-92 |
|
Al Othman Consultants Tel. #03- 895 1717 |
As-Built Survey & Mapping - As built survey
and Mapping for two (2) sites. - Establishing
Boundary Corners at each site |
and
Al khobar Industrial Areas |
23,000 |
Field Crew (4 men) Survey CAD Draftsman |
1 1 |
Prime Two (2) calls |
Jul-91 |
Sep-91 |
|
CRS
Sirrine + Metcalf and Eddy Jv. For / R. S. A. F. Tel. # 01-476 1900 |
Engineering Survey : - Setting out survey
as per Engineering Drawings includes Utilities, Road, and Boundaries. |
Al
Ola Madinah
Area |
202,000 |
Field Crews (3 men) Supervising Surveyor Support crew (3 men) |
2 1 1 |
Prime |
Jul-91 |
Aug-91 |
|
Saudi Consulting Services For / M.O.C. Tel. # 01-465 9975 |
Road Survey & Mapping : - Topographic survey
for proposed Al Hada - |
Al
Shifa- Al
Hada Taif
Area |
200,000 |
Field Crews (3 men) Supervising Surveyor Survey Controller |
3 1 2 |
Prime |
Jul-91 |
Dec-91 |
|
National Methanol Co. ( IBN SINA) Tel. #03-340 5534 |
Topographic & As-Built Survey: - Topographic &
As-built survey for two (2) sites includes Establishing Reference Controls. |
Jubail Industrial
city &
Industrial sea
port |
30,000 |
Field Crew (4 men) Survey CAD Draftsman |
1 1 |
Prime |
Aug-91 |
Sep-91 |
|
Abahsain - Secem Ltd. For / SCECO East Tel. # 03-864-3795 |
Topographic survey & Mapping: - For (4)
Sub-stations including establishing boundary controls and Setting out points
as per engineering drawings |
Nariyah Qaisumah Khursaniyah & Khobar |
117,000 |
Field Crew (4 men) Survey CAD Draftsman Survey Controller |
1 1 1 |
Prime On-call basis |
Sep-91 |
Oct-93 |
|
CRS Sirrine + Metcalf and Eddy Jv. For / R. S. A. F. Tel. # 01-476 1900 |
Topographic survey & Mapping : - For a Remote site,
includes 18 km. Route survey, - Plan & Profile
and Setting out points as per engineering drawings. |
Tabouk
Area Jabal
Al Lwz |
910,000 |
Field Crews (4 men) Survey CAD Draftsman Supervising Surveyor Survey Controller Support crews (4 men) |
2 2 1 1 1 |
Prime Four (4) calls |
Oct-91 |
Sep-92 |
|
National Methanol Co. ( IBN SINA) Tel. # 03-340 5534 |
Pipeline surveys & Mapping: - Profile survey and
mapping for proposed 70 km. pipeline includes Road crossing, and Establishing
Reference Control |
Juaymah To Jubail |
145,000 |
Field Crews (4 men) Project Manager Survey CAD Draftsman |
2 1 2 |
Prime |
Mar-92 |
Apr-92 |
|
Sofinfra, Paris Tel. # 02-637 7777 |
Topographic survey & Mapping: - For a site at
K.F.N.B. in Jeddah - As built survey and
Mapping for a site at Jubail Naval Base. |
Jeddah & Jubail |
81,000 |
Field Crew (4 men) Supervising Surveyor Survey CAD Draftsman |
1 1 1 |
Prime Two (2) calls |
Mar-92 Feb-93 |
Apr-92 Mar-93 |
|
National Methanol Co. (IBN SINA) Tel. # 01-340 5334 |
Provision of survey crew services: | |||||||