SAUDI COMET COMPANY LTD.
SURVEY DIVISION
LIST OF MAJOR SURVEYING PROJECTS PERFORMED SINCE 1984
   
                   
 Client's Name General Description Location Value Average   Prime or Start Completion  
Contact/Phone No. Of Work   (SR) Manpower   Subcontract Date Date  
        Type No. Responsibility      
                   
  Saudi Aramco   General Surveying Services:   30 Million   Field Crews 5 Prime Sep/85 Dec.-1990  
  Surveying Services Division   - Primary & Secondary Network Observations Saudi Aramco 4.9 Million   Survey CAD Draftsman 7 Subcontract Jan.-91 Dec.-1992  
  Dhahran   - Topographic Survey & Photo Controls Operating 32.9 Million   Photogrammetrist 8 Prime Sep.-95 Nov.-2003  
  Tel. # 872 7811   - As-Built, Profiling, Volume and all aspects Areas Estimated   System Analyst 3 Prime Oct.-03 Sep.-2008  
       of field Engineering   18 Million   Supervising Surveyor 2     Ongoing  
  Hod-hod Establishment   Visibility Study of Microwave Towers Between 40,000   Field Crews (4 men) 2 Prime Oct-84 Nov-84  
  For / P.T.T    - Profile survey for Microwave Towers Jeddah and     Survey CAD Draftsman 1        
  Tel. #  01- 491 9516      between Jeddah & Makkah Makkah              
                   
  B.K.S. Surveys Ltd.  Photogrammetric Ground Controls   7.2 Million   Field Crews (3 men) 5 Prime Apr-84 Dec-86  
  For / MOMRA Project # 107   - Pre-marking of photo control points Eastern     Survey Controller 4        
  Tel. #  01- 402 4462   - Establishing horizontal and vertical  Province     Survey CAD Draftsman 2        
      controls positions includes G.P.S. Fixation.       Project Manager 1        
    -  Map compilation and Name collection       Quality Controller 2        
                   
  Pegel Arabia   As-Built Survey: Safaniyah 60,000   Field Crew (4 men) 1 Prime Oct-84 Feb-85  
  For / Saudi Aramco   - As-Built survey of ARAMCO security Juaymah and     Survey Controller 1        
  Tel. #  864 1400     Fencing Abqaiq     Survey CAD Draftsman 1        
                   
 Saudi Consulting Services   Road Survey: Ras Abu 85,000   Field Crews (3 men) 2 Prime Jan-85 Feb-85  
  For / M.O.C.   - 40 Km. of proposed road. Qumayyis     Survey Controller 1        
  Tel. #  01- 464 7540   - Profile survey and Establishing Controls Saudi - Qatar     Survey CAD Draftsman 1        
    Border     Supervising Surveyor 1        
                   
  SCECO-East   General Surveying Services - includes   1.3 Million            
    -  Establishing Controls SCECO East     Field Crew (4 men) 1 Prime May-85 Apr-88  
  Tel. # 858 6463   - Topographic, Plan and Profile Surveys Operating     Survey CAD Draftsman 2        
    - Drafting works (in house)  Areas              
    - Other survey services as required by client                
                   
 Saudi Arabian Vulcan Ltd.   Quantity Survey: Jubail 170,000   Field Crew (4 men) 1 Prime Oct-85 Jun-90  
    -  Stock pile survey and volume Nariyah     Survey CAD Draftsman 1 On-call basis      
  Tel. #  03-341 7377      Calculations Safaniyah     Survey Controller 1        
    Khafji              
  Siemens   -  Topographic Survey & Mapping   50,000   Field Crew (4 men) 1 Prime Nov-85 Nov-85  
    -  Establish horizontal and vertical controls Dammam     Survey Controller 1        
  Tel. # 857 5316   - Tie-in site coordinates to N.G.N coordinates       Survey CAD Draftsman 1        
       system.                
                   
  Bin Sahal Establishment   Utilities Survey:   200,000   Field Crew (3 men) 2 Prime Dec-85 May-86  
  For / Ministry of Housing   - Setting out and Quality Control of sewage Housing Project     Project Engineer 1        
  Tel. # 894 2892     and water installations.  Al Hasa              
  McClelland Suhaimi Ltd.  Saudi Iraqi Pipeline Project.   200,000   Field Crews (3 men) 2 Subcontractor Jan-86 Mar-86  
  For / Brown & Root   - Topographic survey and mapping Yanbu Marine     Project Manager 1        
  Tel. # 857 2163   -  Fixing control points Terminal     Survey Controller 2        
    - Establishing site Boundary monuments       Survey CAD Draftsman 2        
                   
  Harza Engg. Co. Int'l  Qatif Irrigation Project   30,000   Field Crew (4 men) 1 Prime Dec-85 Mar-86  
    - Profiles and Cross Section surveys Qatif     Survey Controller 1 On-call basis      
  Tel. # 827 1252   - Provision of computer plots       Survey CAD Draftsman 1        
                   
  Saudi Consulting House  Industrial Estate Expansion Riyadh 100,000   Field Crews (4 men) 3 Prime Feb-86 Apr-86  
  For / Ministry of Industry   - Topographic survey and Mapping for 3 sites Jeddah     Survey Controller 2        
  Tel. # 01- 448 8151   - Establishing Reference Control Points Dammam     Survey CAD Draftsman 2        
                   
  O.C.C. Weavers   Site Surveys: Jeddah 40,000   Field Crew 1 Prime Mar-87 Apr-87  
    - Topographic survey and mapping includes Dhahran     Survey CAD Draftsman 1        
  Tel. # 02-651 7741      setting out boundary corners for 3 sites. Abha              
                   
  McClelland Suhaimi Ltd.  Marine Terminal Phase II   70,000   Field Crews (3 men) 2 Prime Oct-87 Dec-87  
    - Route survey and Fixing Boundary Points Yanbu     Survey Controller 1        
  Tel. #  03-857 5752      includes Mapping.       Survey CAD Draftsman 2        
                   
  Gulf Consult  Power Line Surveys: Dhahran 40,000   Field Crew (4 men) 1 Prime Aug-87 Feb-88  
  For / SCECO   -  Setting out 662 Points being centers of  Juddah              
  Tel. # 03-894 4468      proposed Towers - 3 stages Khurais              
                   
  Muhandis Nizar Kurdi   As-Built Survey:   50,000   Field Crew (4 men) 1 Sub Contractor May-87 Jul-87  
  For / R.D.A   - As-built survey for highly developed Riyadh     Survey Controller 1  For/Saud Consult      
  Tel. #  01- 477 0870     area near Qasr Al Hokum includes provision       Survey CAD Draftsman 1        
      of detail computer drawings                 
                   
  T. R. T. Saudi Arabia   Profile Surveys of Telecom. Towers Hail 215,000   Field Crews (2 men) 4 Prime Mar-88 Nov-88  
  For / P.T.T.   - Profile survey and visibility study between Qasim       (2 stages)      
      proposed telecommunication sites. Riyadh              
  Tel. #  01- 482 9931   Asir              
                   
  CRS Sirrine + Metcalf &  Peace Shield Program Riyadh 1.2 Million   Field Crews (3 men) 4 Prime Mar-88 Mar-89  
  Eddy Jv.    -  Topographic survey and Mapping for Tabouk     Survey Controller 2 On-call basis      
  For / R.S.A.F.      52 Remote Communication Sites. Al Kharj     Survey CAD Draftsman 2        
  Tel. # 01-476 1900   - Establishing Reference Control Points Dhahran     Survey Supervisor 1        
    Khamis     Quality Controller 1        
  B.K.S. Surveys Ltd.   Photogrammetic Ground Control Makkah 3.1 Million   Field Crews (3 men) 4 Prime Mar-88 Dec-91  
  For / MOMRA Project # 110   -  All field works related  i.e. : Madinah     Supervising Surveyor 1        
  Tel. # 01-402 4462      Traversing, Levelling, Photo identification Al Jouf     Quality Controller 1        
       Map  compilation & Names collection Quraiyat     Survey CAD Draftsman 1        
                   
  MAPS (U.A.E.)   Geodetic Survey: Between 30,000    Field Crew (4 men) 1 Prime Mar-88 Apr-88  
     - Traversing & Leveling along proposed Riyadh and              
   Tel. # 01-478 6671       Road center line Qaisumah              
                   
   Idea Perkins & Will   Umm Al Qura University:   350,000    Field Crew (3 men) 3 Prime Jun-88 Dec-88  
  For / Umm Al Qura Univ.   - Topographic survey and mapping for the  Makkah      Survey Controller 2        
  Tel. # (02) 651 5392      proposed site measuring 1600 hectares.        Survey CAD Draftsman 2        
    - Establishing controls, Traversing & Leveling        Supervising Surveyor 1        
    - Tie-in site controls to NGN system                
 Al Issa Consulting Engineers   Provision of survey crew services   40,000   Field Crew (4 men) 1 Prime Jul-88 Aug-88  
    - Provision of survey crew services to  Riyadh              
  Tel. # 01-491 7880      perform Topographic Survey.                
                   
  Eagleton Saudi Arabia   Route survey - Power Line   70,000   Field Crew (4 men) 1 Prime Sep-88 Nov-88  
    - Traversing, Leveling and Establishing controls Sajir to     Survey Controller 1        
  Tel. # 864 8847   - Profile survey along proposed transmission Khuff     Survey CAD Draftsman 1        
       line (70 km) long. Central Region              
    - Marking Route Center Line                
  Muhandis Nizar Kurdi   Provision of survey crew services   25,000   Field Crew (3 men) 1 Prime Mar-89 Apr-89  
    - Traversing, Leveling and Establishing Riyadh              
  Tel. # 01-476 7750      controls points                
                   
  Bin Qurayah Est.   Provision of Survey Party Chief Services   10,000   Party Chief 1 Prime Jul-89 Aug-89  
  For / Saudi Aramco    -  Laying out pipeline survey Abqaiq              
  Tel. # 03-572 6735                  
                   
  Siemens Project Office   Topographic survey and Mapping Jeddah 170,000   Field Crew (4 men) 1 Prime Jul-89 Apr-92  
  For / M. O. I   - Topographic survey and mapping of  Haql     Survey Controller 1 On-call basis      
  Tel. # 01-482 6774      proposed communication sites includes   Tabouk     Survey CAD Draftsman 1        
       Tie-in coordinates of each site to NGN Salail              
       coordinates system. Dammam              
  Al Issa Consulting and   Boundary Surveys  Along 33,000   Field Crew (3 men) 1 Prime Sep-89 Oct-89  
  Engineers   - Setting out & Establishing boundary point  Dammam              
  For / National Guard      every 1km. distance along the perimeter of  Riyadh              
  Tel. # 01-491 7880      a site measuring 36 Km. long. Highway              
  Gulf Edible Oil Co. Ltd.   Site survey and Mapping   15,000   Field Crew (3 men) 1 Prime Dec-89 Dec-89  
    - Topographic survey and Mapping for  Dammam     Survey Controller 1        
  Tel. # 833 1329      proposed site at Dammam 2nd                
       Industrial Area.                
                   
 British Aerospace   Al-Yamamah Project   125,000   Field Crew (4 men) 1 Prime Dec-89 Feb-90  
  For / R.S.A.F   - Topographic survey and mapping for KKAB, Khamis     Survey CAD Draftsman 2        
  Tel. # 01-464 6600      48 selected sites located at KKAB, Mushait     Saudi Representative 1        
       Khamis Mushait       Survey CAD Draftsman 1        
                   
 Saudi Bahraini Cement Co.  Boundary Surveys & Establishing Grids   45,000   Field Crews (3 men) 2 Prime Jan-90 Feb-90  
    - Setting out & Establishing boundary points  Uqair and     Survey CAD Draftsman 2        
  Tel. # 03-566 0600      for two sites ( 4km x 2 km) and (2km x 1km) Umm Huwaiyd              
    - Establishing Grid Points @ 250m. intervals.                
                   
 Al-Issa Consulting Engrs.  Provision of survey crew services   90,000   Field Crew (4 men) 1 Prime May-90 Jul-90  
  For / National Guard   - Provision of survey crew services to  Al Hasa              
  Tel. # 01-491 7880      perform Topographic survey for an existing                
       Military Camp.                
                   
 Arabian Consulting Eng.   Pipeline Survey    330,000   Field Crews (4 men) 2 Prime Aug-90 Oct-90  
 Center (A.C.E.C.)   - 68 Km of proposed pipeline survey  Juaymah     Project Manager 1        
  For / PETROKEMYA      including plan and profile drawings to     Survey CAD Draftsman 3        
  Tel. # 03-857 8110      and Road crossings (ARAMCO standard) Jubail     Survey Controller          
                   
 Saudi Wiemer & Trachte  Topographic Survey and Mapping Riyadh 250,000   Field Crew (3 men) 1 Prime Sep-90 Apr-92  
    - Topographic survey and Mapping for Tabouk     Survey CAD Draftsman 1 On-call basis      
  Tel. # 01- 241 2171      proposed communications tower locations. Abha              
                   
 CRS Sirrine + Metcalf and   Peace Shield Program   350,000   Field Crews (3 men) 2 Prime Sep-90 Dec-90  
 Eddy Jv.   - Topographic survey and mapping for a prop. Madinah Area     Survey CAD Draftsman 2        
  For / R.S.A.F.      military site in a remote area "inaccessible       Supervising Surveyor 1        
  Tel. # 01-476 1900      by vehicles" includes Establishing Controls       Survey Controller 1        
                   
 MACE Saudi Arabia Ltd.  Topographic survey and Setting out Eastern 540,000   Field Crews (3 men) 5 Prime Oct-90 Jan-91  
  For / US Army Corps of   - Topographic survey and mapping for six (6) Province     Survey CAD Draftsman 3        
  Engineers      military camps including Setting out of site   along Saudi     Supervising Surveyor 1        
  Tel. # 03-894 8887      corners and All utilities as per Eng.. Drawings. Kuwait Border              
                   
 Al Haider Co. for Trading  Power line survey   60,000   Field Crew (4 men) 1 Prime Feb-91 Mar-91  
 and Contracting   - Plan and profile survey for proposed  Jubail area     Survey CAD Draftsman 2        
  For/ SCECO East     Power Line measuring 27 km. long.                
  Tel. # 667 3700   - Marking Towers Locations                
 Olayan Descon Industrial  Pipeline Survey   25,000   Field Crew (3 men) 1 Prime Mar-91 Mar-91  
 Company Ltd.   - As built plan and profile survey for 2 km. Jubail     Survey CAD Draftsman 1        
  Tel. # 341 0672     of existing pipeline. Industrial city              
                   
 Arabian Consulting  Expansion of SAMAREC Plant, Gizan   60,000   Field Crew (4 men) 1 Prime Apr-91 May-91  
 Engineering Center (ACEC)   - Topographic and As-built Survey for Gizan     Survey CAD Draftsman 1        
  Tel. # 857 8110      a selected area at SAMAREC Plant in Gizan                
                   
 Al-Hammam Company  Power line survey   30,000   Field Crew (3 men) 1 Prime May-91 Jun-91  
  For / Saudi Aramco   - Marking power post locations for Manifa              
  Tel. # 667 2715     13.5 km. long of proposed transmission line                
                   
 Crowley Maritime Corp.  Quantity Survey Khalij 96,000   Field Crew (4 men) 1 Prime May-91 Nov-91  
  For / MEPA   - Cross Sections and volume calculations Mardomah     Survey CAD Draftsman 2 Three (3) calls      
  Tel. # 857 3765      including setting out. Eastern Province              
                   
 Rashid Geotechnical and  Provision of survey crew services   240,000   Field Crew 1 Prime May-91 Feb-92  
 Materials Engineers   - Topographic survey and other survey  Riyadh       Three (3) calls      
  Tel. # 01-477 3601      Aspects as per client requirements. and Gizan              
                   
 Al Othman Consultants  As-Built Survey and Mapping Riyadh 23,000   Field Crew (4 men) 1 Prime Jul-91 Sep-91  
    - As built survey and Mapping for  and Alkhobar     Survey CAD Draftsman 1 Two (2) calls      
  Tel. # 895 1717      two (2) sites. Industrial              
    - Establishing Boundary Corners at each site Areas              
                   
 CRS Sirrine + Metcalf and  Engineering Survey :   202,000   Field Crews (3 men) 2 Prime Jul-91 Aug-91  
 Eddy Jv.   - Setting out survey as per Engineering Al Ola     Supervising Surveyor 1        
  For / R. S. A. F.      Drawings includes Utilities, Road, Madinah Area     Support crew (3 men) 1        
  Tel. # 01-476 1900      Boundary & Buildings.                
                   
 Saudi Consulting Services  Road Survey :   200,000   Field Crews (3 men) 3 Prime Jul-91 Dec-91  
  For / M.O.C.   - Topographic survey for proposed Al Hada - Al Shifa-     Supervising Surveyor 1        
  Tel. # 01-465 9975      Al Shifa Road (45 Km long x 500m width) Al Hada     Survey Controller 2        
       includes Controls & Marking Route Centerline. Taif Area