| SAUDI COMET COMPANY LTD. |
|
|
|
| SURVEY DIVISION |
|
| LIST OF MAJOR
SURVEYING PROJECTS PERFORMED SINCE 1984 |
|
| |
|
|
| |
|
|
|
|
|
|
|
|
|
| Client's Name |
General Description |
Location |
Value |
Average |
|
Prime or |
Start |
Completion |
|
| Contact/Phone No. |
Of Work |
|
(SR) |
Manpower |
|
Subcontract |
Date |
Date |
|
| |
|
|
|
Type |
No. |
Responsibility |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Aramco |
General
Surveying Services: |
|
30 Million |
Field Crews |
5 |
Prime |
Sep/85 |
Dec.-1990 |
|
| Surveying Services Division |
- Primary
& Secondary Network Observations |
Saudi Aramco |
4.9 Million |
Survey CAD
Draftsman |
7 |
Subcontract |
Jan.-91 |
Dec.-1992 |
|
| Dhahran |
-
Topographic Survey & Photo Controls |
Operating |
32.9 Million |
Photogrammetrist |
8 |
Prime |
Sep.-95 |
Nov.-2003 |
|
| Tel. # 872 7811 |
-
As-Built, Profiling, Volume and all aspects |
Areas |
Estimated |
System
Analyst |
3 |
Prime |
Oct.-03 |
Sep.-2008 |
|
| |
of
field Engineering |
|
18 Million |
Supervising
Surveyor |
2 |
|
|
Ongoing |
|
| Hod-hod Establishment |
Visibility
Study of Microwave Towers |
Between |
40,000 |
Field Crews
(4 men) |
2 |
Prime |
Oct-84 |
Nov-84 |
|
| For / P.T.T |
- Profile
survey for Microwave Towers |
Jeddah and |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| Tel. #
01- 491 9516 |
between
Jeddah & Makkah |
Makkah |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| B.K.S. Surveys Ltd. |
Photogrammetric Ground Controls |
|
7.2 Million |
Field Crews
(3 men) |
5 |
Prime |
Apr-84 |
Dec-86 |
|
| For / MOMRA Project # 107 |
-
Pre-marking of photo control points |
Eastern |
|
Survey
Controller |
4 |
|
|
|
|
| Tel. #
01- 402 4462 |
-
Establishing horizontal and vertical |
Province |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| |
controls
positions includes G.P.S. Fixation. |
|
|
Project
Manager |
1 |
|
|
|
|
| |
- Map compilation and Name collection |
|
|
Quality
Controller |
2 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Pegel Arabia |
As-Built
Survey: |
Safaniyah |
60,000 |
Field Crew
(4 men) |
1 |
Prime |
Oct-84 |
Feb-85 |
|
| For / Saudi Aramco |
- As-Built
survey of ARAMCO security |
Juaymah and |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. #
864 1400 |
Fencing |
Abqaiq |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Consulting Services |
Road
Survey: |
Ras Abu |
85,000 |
Field Crews
(3 men) |
2 |
Prime |
Jan-85 |
Feb-85 |
|
| For / M.O.C. |
- 40 Km.
of proposed road. |
Qumayyis |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. #
01- 464 7540 |
- Profile
survey and Establishing Controls |
Saudi - Qatar |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
|
Border |
|
Supervising
Surveyor |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| SCECO-East |
General
Surveying Services - includes |
|
1.3 Million |
|
|
|
|
|
|
| |
- Establishing Controls |
SCECO East |
|
Field Crew
(4 men) |
1 |
Prime |
May-85 |
Apr-88 |
|
| Tel. # 858 6463 |
-
Topographic, Plan and Profile Surveys |
Operating |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| |
- Drafting
works (in house) |
Areas |
|
|
|
|
|
|
|
| |
- Other
survey services as required by client |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Arabian Vulcan Ltd. |
Quantity
Survey: |
Jubail |
170,000 |
Field Crew
(4 men) |
1 |
Prime |
Oct-85 |
Jun-90 |
|
| |
- Stock pile survey and volume |
Nariyah |
|
Survey CAD
Draftsman |
1 |
On-call basis |
|
|
|
| Tel. #
03-341 7377 |
Calculations |
Safaniyah |
|
Survey
Controller |
1 |
|
|
|
|
| |
|
Khafji |
|
|
|
|
|
|
|
| Siemens |
- Topographic Survey & Mapping |
|
50,000 |
Field Crew
(4 men) |
1 |
Prime |
Nov-85 |
Nov-85 |
|
| |
- Establish horizontal and vertical controls |
Dammam |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. # 857 5316 |
- Tie-in
site coordinates to N.G.N coordinates |
|
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
system. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Bin Sahal Establishment |
Utilities
Survey: |
|
200,000 |
Field Crew
(3 men) |
2 |
Prime |
Dec-85 |
May-86 |
|
| For / Ministry of Housing |
- Setting
out and Quality Control of sewage |
Housing Project |
|
Project
Engineer |
1 |
|
|
|
|
| Tel. # 894 2892 |
and
water installations. |
Al Hasa |
|
|
|
|
|
|
|
| McClelland Suhaimi Ltd. |
Saudi Iraqi
Pipeline Project. |
|
200,000 |
Field Crews
(3 men) |
2 |
Subcontractor |
Jan-86 |
Mar-86 |
|
| For / Brown & Root |
-
Topographic survey and mapping |
Yanbu Marine |
|
Project
Manager |
1 |
|
|
|
|
| Tel. # 857 2163 |
- Fixing control points |
Terminal |
|
Survey
Controller |
2 |
|
|
|
|
| |
-
Establishing site Boundary monuments |
|
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Harza Engg. Co. Int'l |
Qatif
Irrigation Project |
|
30,000 |
Field Crew
(4 men) |
1 |
Prime |
Dec-85 |
Mar-86 |
|
| |
- Profiles
and Cross Section surveys |
Qatif |
|
Survey
Controller |
1 |
On-call basis |
|
|
|
| Tel. # 827 1252 |
-
Provision of computer plots |
|
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Consulting House |
Industrial
Estate Expansion |
Riyadh |
100,000 |
Field Crews
(4 men) |
3 |
Prime |
Feb-86 |
Apr-86 |
|
| For / Ministry of Industry |
-
Topographic survey and Mapping for 3 sites |
Jeddah |
|
Survey
Controller |
2 |
|
|
|
|
| Tel. # 01- 448 8151 |
-
Establishing Reference Control Points |
Dammam |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| O.C.C. Weavers |
Site
Surveys: |
Jeddah |
40,000 |
Field Crew |
1 |
Prime |
Mar-87 |
Apr-87 |
|
| |
-
Topographic survey and mapping includes |
Dhahran |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| Tel. # 02-651 7741 |
setting
out boundary corners for 3 sites. |
Abha |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| McClelland Suhaimi Ltd. |
Marine
Terminal Phase II |
|
70,000 |
Field Crews
(3 men) |
2 |
Prime |
Oct-87 |
Dec-87 |
|
| |
- Route
survey and Fixing Boundary Points |
Yanbu |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. #
03-857 5752 |
includes Mapping. |
|
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Gulf Consult |
Power Line
Surveys: |
Dhahran |
40,000 |
Field Crew
(4 men) |
1 |
Prime |
Aug-87 |
Feb-88 |
|
| For / SCECO |
- Setting out 662 Points being centers of |
Juddah |
|
|
|
|
|
|
|
| Tel. # 03-894 4468 |
proposed Towers - 3 stages |
Khurais |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Muhandis Nizar Kurdi |
As-Built
Survey: |
|
50,000 |
Field Crew
(4 men) |
1 |
Sub Contractor |
May-87 |
Jul-87 |
|
| For / R.D.A |
- As-built
survey for highly developed |
Riyadh |
|
Survey
Controller |
1 |
For/Saud Consult |
|
|
|
| Tel. #
01- 477 0870 |
area
near Qasr Al Hokum includes provision |
|
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
of
detail computer drawings |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| T. R. T. Saudi Arabia |
Profile
Surveys of Telecom. Towers |
Hail |
215,000 |
Field Crews
(2 men) |
4 |
Prime |
Mar-88 |
Nov-88 |
|
| For / P.T.T. |
- Profile
survey and visibility study between |
Qasim |
|
|
|
(2 stages) |
|
|
|
| |
proposed
telecommunication sites. |
Riyadh |
|
|
|
|
|
|
|
| Tel. #
01- 482 9931 |
|
Asir |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| CRS Sirrine + Metcalf & |
Peace
Shield Program |
Riyadh |
1.2 Million |
Field
Crews (3 men) |
4 |
Prime |
Mar-88 |
Mar-89 |
|
| Eddy Jv. |
- Topographic survey and Mapping for |
Tabouk |
|
Survey
Controller |
2 |
On-call basis |
|
|
|
| For / R.S.A.F. |
52
Remote Communication Sites. |
Al Kharj |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| Tel. # 01-476 1900 |
-
Establishing Reference Control Points |
Dhahran |
|
Survey
Supervisor |
1 |
|
|
|
|
| |
|
Khamis |
|
Quality
Controller |
1 |
|
|
|
|
| B.K.S. Surveys Ltd. |
Photogrammetic Ground Control |
Makkah |
3.1 Million |
Field
Crews (3 men) |
4 |
Prime |
Mar-88 |
Dec-91 |
|
| For / MOMRA Project # 110 |
- All field works related i.e. : |
Madinah |
|
Supervising Surveyor |
1 |
|
|
|
|
| Tel. # 01-402 4462 |
Traversing, Levelling, Photo identification |
Al Jouf |
|
Quality
Controller |
1 |
|
|
|
|
| |
Map compilation & Names
collection |
Quraiyat |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| MAPS (U.A.E.) |
Geodetic
Survey: |
Between |
30,000 |
Field
Crew (4 men) |
1 |
Prime |
Mar-88 |
Apr-88 |
|
| |
-
Traversing & Leveling along proposed |
Riyadh and |
|
|
|
|
|
|
|
| Tel. # 01-478 6671 |
Road
center line |
Qaisumah |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Idea Perkins & Will |
Umm Al
Qura University: |
|
350,000 |
Field
Crew (3 men) |
3 |
Prime |
Jun-88 |
Dec-88 |
|
| For / Umm Al Qura Univ. |
-
Topographic survey and mapping for the |
Makkah |
|
Survey
Controller |
2 |
|
|
|
|
| Tel. # (02) 651 5392 |
proposed site measuring 1600 hectares. |
|
|
Survey
CAD Draftsman |
2 |
|
|
|
|
| |
-
Establishing controls, Traversing & Leveling |
|
|
Supervising Surveyor |
1 |
|
|
|
|
| |
- Tie-in
site controls to NGN system |
|
|
|
|
|
|
|
|
| Al Issa Consulting Engineers |
Provision
of survey crew services |
|
40,000 |
Field Crew
(4 men) |
1 |
Prime |
Jul-88 |
Aug-88 |
|
| |
-
Provision of survey crew services to |
Riyadh |
|
|
|
|
|
|
|
| Tel. # 01-491 7880 |
perform
Topographic Survey. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Eagleton Saudi Arabia |
Route
survey - Power Line |
|
70,000 |
Field Crew
(4 men) |
1 |
Prime |
Sep-88 |
Nov-88 |
|
| |
-
Traversing, Leveling and Establishing controls |
Sajir to |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. # 864 8847 |
- Profile
survey along proposed transmission |
Khuff |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
line
(70 km) long. |
Central Region |
|
|
|
|
|
|
|
| |
- Marking
Route Center Line |
|
|
|
|
|
|
|
|
| Muhandis Nizar Kurdi |
Provision
of survey crew services |
|
25,000 |
Field Crew
(3 men) |
1 |
Prime |
Mar-89 |
Apr-89 |
|
| |
-
Traversing, Leveling and Establishing |
Riyadh |
|
|
|
|
|
|
|
| Tel. # 01-476 7750 |
controls points |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Bin Qurayah Est. |
Provision
of Survey Party Chief Services |
|
10,000 |
Party
Chief |
1 |
Prime |
Jul-89 |
Aug-89 |
|
| For / Saudi Aramco |
- Laying out pipeline survey |
Abqaiq |
|
|
|
|
|
|
|
| Tel. # 03-572 6735 |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Siemens Project Office |
Topographic survey and Mapping |
Jeddah |
170,000 |
Field Crew
(4 men) |
1 |
Prime |
Jul-89 |
Apr-92 |
|
| For / M. O. I |
-
Topographic survey and mapping of |
Haql |
|
Survey
Controller |
1 |
On-call basis |
|
|
|
| Tel. # 01-482 6774 |
proposed communication sites includes |
Tabouk |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
Tie-in
coordinates of each site to NGN |
Salail |
|
|
|
|
|
|
|
| |
coordinates system. |
Dammam |
|
|
|
|
|
|
|
| Al Issa Consulting and |
Boundary
Surveys |
Along |
33,000 |
Field Crew
(3 men) |
1 |
Prime |
Sep-89 |
Oct-89 |
|
| Engineers |
- Setting
out & Establishing boundary point |
Dammam |
|
|
|
|
|
|
|
| For / National Guard |
every
1km. distance along the perimeter of |
Riyadh |
|
|
|
|
|
|
|
| Tel. # 01-491 7880 |
a site
measuring 36 Km. long. |
Highway |
|
|
|
|
|
|
|
| Gulf Edible Oil Co. Ltd. |
Site
survey and Mapping |
|
15,000 |
Field Crew
(3 men) |
1 |
Prime |
Dec-89 |
Dec-89 |
|
| |
-
Topographic survey and Mapping for |
Dammam |
|
Survey
Controller |
1 |
|
|
|
|
| Tel. # 833 1329 |
proposed site at Dammam 2nd |
|
|
|
|
|
|
|
|
| |
Industrial Area. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| British Aerospace |
Al-Yamamah
Project |
|
125,000 |
Field Crew
(4 men) |
1 |
Prime |
Dec-89 |
Feb-90 |
|
| For / R.S.A.F |
-
Topographic survey and mapping for |
KKAB, Khamis |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| Tel. # 01-464 6600 |
48
selected sites located at KKAB, |
Mushait |
|
Saudi
Representative |
1 |
|
|
|
|
| |
Khamis
Mushait |
|
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Bahraini Cement Co. |
Boundary
Surveys & Establishing Grids |
|
45,000 |
Field
Crews (3 men) |
2 |
Prime |
Jan-90 |
Feb-90 |
|
| |
- Setting
out & Establishing boundary points |
Uqair and |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| Tel. # 03-566 0600 |
for two
sites ( 4km x 2 km) and (2km x 1km) |
Umm Huwaiyd |
|
|
|
|
|
|
|
| |
-
Establishing Grid Points @ 250m. intervals. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Al-Issa Consulting Engrs. |
Provision
of survey crew services |
|
90,000 |
Field Crew
(4 men) |
1 |
Prime |
May-90 |
Jul-90 |
|
| For / National Guard |
-
Provision of survey crew services to |
Al Hasa |
|
|
|
|
|
|
|
| Tel. # 01-491 7880 |
perform
Topographic survey for an existing |
|
|
|
|
|
|
|
|
| |
Military Camp. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Arabian Consulting Eng. |
Pipeline
Survey |
|
330,000 |
Field
Crews (4 men) |
2 |
Prime |
Aug-90 |
Oct-90 |
|
| Center (A.C.E.C.) |
- 68 Km of
proposed pipeline survey |
Juaymah |
|
Project
Manager |
1 |
|
|
|
|
| For / PETROKEMYA |
including plan and profile drawings |
to |
|
Survey CAD
Draftsman |
3 |
|
|
|
|
| Tel. # 03-857 8110 |
and
Road crossings (ARAMCO standard) |
Jubail |
|
Survey
Controller |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Wiemer & Trachte |
Topographic
Survey and Mapping |
Riyadh |
250,000 |
Field Crew
(3 men) |
1 |
Prime |
Sep-90 |
Apr-92 |
|
| |
-
Topographic survey and Mapping for |
Tabouk |
|
Survey CAD
Draftsman |
1 |
On-call basis |
|
|
|
| Tel. # 01- 241 2171 |
proposed communications tower locations. |
Abha |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| CRS Sirrine + Metcalf and |
Peace
Shield Program |
|
350,000 |
Field
Crews (3 men) |
2 |
Prime |
Sep-90 |
Dec-90 |
|
| Eddy Jv. |
-
Topographic survey and mapping for a prop. |
Madinah Area |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| For / R.S.A.F. |
military site in a remote area "inaccessible |
|
|
Supervising Surveyor |
1 |
|
|
|
|
| Tel. # 01-476 1900 |
by
vehicles" includes Establishing Controls |
|
|
Survey
Controller |
1 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| MACE Saudi Arabia Ltd. |
Topographic
survey and Setting out |
Eastern |
540,000 |
Field
Crews (3 men) |
5 |
Prime |
Oct-90 |
Jan-91 |
|
| For / US Army Corps of |
-
Topographic survey and mapping for six (6) |
Province |
|
Survey CAD
Draftsman |
3 |
|
|
|
|
| Engineers |
military camps including Setting out of site |
along Saudi |
|
Supervising Surveyor |
1 |
|
|
|
|
| Tel. # 03-894 8887 |
corners
and All utilities as per Eng.. Drawings. |
Kuwait Border |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Al Haider Co. for Trading |
Power line
survey |
|
60,000 |
Field Crew
(4 men) |
1 |
Prime |
Feb-91 |
Mar-91 |
|
| and Contracting |
- Plan and
profile survey for proposed |
Jubail area |
|
Survey CAD
Draftsman |
2 |
|
|
|
|
| For/ SCECO East |
Power
Line measuring 27 km. long. |
|
|
|
|
|
|
|
|
| Tel. # 667 3700 |
- Marking
Towers Locations |
|
|
|
|
|
|
|
|
| Olayan Descon Industrial |
Pipeline
Survey |
|
25,000 |
Field Crew
(3 men) |
1 |
Prime |
Mar-91 |
Mar-91 |
|
| Company Ltd. |
- As built
plan and profile survey for 2 km. |
Jubail |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| Tel. # 341 0672 |
of
existing pipeline. |
Industrial city |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Arabian Consulting |
Expansion
of SAMAREC Plant, Gizan |
|
60,000 |
Field Crew
(4 men) |
1 |
Prime |
Apr-91 |
May-91 |
|
| Engineering Center (ACEC) |
-
Topographic and As-built Survey for |
Gizan |
|
Survey CAD
Draftsman |
1 |
|
|
|
|
| Tel. # 857 8110 |
a
selected area at SAMAREC Plant in Gizan |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Al-Hammam Company |
Power line
survey |
|
30,000 |
Field Crew
(3 men) |
1 |
Prime |
May-91 |
Jun-91 |
|
| For / Saudi Aramco |
- Marking
power post locations for |
Manifa |
|
|
|
|
|
|
|
| Tel. # 667 2715 |
13.5 km.
long of proposed transmission line |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Crowley Maritime Corp. |
Quantity
Survey |
Khalij |
96,000 |
Field Crew
(4 men) |
1 |
Prime |
May-91 |
Nov-91 |
|
| For / MEPA |
- Cross
Sections and volume calculations |
Mardomah |
|
Survey CAD
Draftsman |
2 |
Three (3) calls |
|
|
|
| Tel. # 857 3765 |
including setting out. |
Eastern Province |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Rashid Geotechnical and |
Provision
of survey crew services |
|
240,000 |
Field Crew |
1 |
Prime |
May-91 |
Feb-92 |
|
| Materials Engineers |
-
Topographic survey and other survey |
Riyadh |
|
|
|
Three (3) calls |
|
|
|
| Tel. # 01-477 3601 |
Aspects
as per client requirements. |
and Gizan |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Al Othman Consultants |
As-Built
Survey and Mapping |
Riyadh |
23,000 |
Field Crew
(4 men) |
1 |
Prime |
Jul-91 |
Sep-91 |
|
| |
- As built
survey and Mapping for |
and Alkhobar |
|
Survey CAD
Draftsman |
1 |
Two (2) calls |
|
|
|
| Tel. # 895 1717 |
two (2)
sites. |
Industrial |
|
|
|
|
|
|
|
| |
-
Establishing Boundary Corners at each site |
Areas |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| CRS Sirrine + Metcalf and |
Engineering
Survey : |
|
202,000 |
Field
Crews (3 men) |
2 |
Prime |
Jul-91 |
Aug-91 |
|
| Eddy Jv. |
- Setting
out survey as per Engineering |
Al Ola |
|
Supervising Surveyor |
1 |
|
|
|
|
| For / R. S. A. F. |
Drawings includes Utilities, Road, |
Madinah Area |
|
Support
crew (3 men) |
1 |
|
|
|
|
| Tel. # 01-476 1900 |
Boundary & Buildings. |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Saudi Consulting Services |
Road Survey
: |
|
200,000 |
Field
Crews (3 men) |
3 |
Prime |
Jul-91 |
Dec-91 |
|
| For / M.O.C. |
-
Topographic survey for proposed Al Hada - |
Al Shifa- |
|
Supervising Surveyor |
1 |
|
|
|
|
| Tel. # 01-465 9975 |
Al
Shifa Road (45 Km long x 500m width) |
Al Hada |
|
Survey
Controller |
2 |
|
|
|
|
| |
includes Controls & Marking Route Centerline. |
Taif Area |
|
|
|
|
|
|
|
| |
|
  |